Discovery 55 Detailed Half Model
22" LOA

This model is a 22" long detailed half model of a Discovery 55.  The model was built from the designer's drawings which Ron Holland Design (http://www.ronhollanddesign.com/) provided.  The model is mounted on satin varnished cherry.


Here is the finished model

Bow view showing the hand planked teak deck and the CQR anchor

Stern view showing cockpit details


Construction Details

This is a picture of the boat I will be modelling.
 

May 6, 08 - This picture shows the model with its station molds and a sacrificial deck in place.  I have also installed the sheer and waterline planks.  I will finish planking the hull this week.

May 25, 08 - Since my last update I have finished planking the hull and have cut the transom in.  After I took this picture I started fiberglassing the hull.  That normally takes 2-3 days.

May 30, 08 - I have now finished fiberglassing the model.  I also built in all the transom details.  After I took this picture I put the first coat of fairing compound on the hull.  I will finish filling and fairing the hull over the weekend and then move on to building the deck and cabin house.

June 6, 08 - I have now finished filling, fairing and priming the hull.  After I took this picture, I put the first coat of flag blue on the topsides.

June 10, 08 - I have now started building coats of flag blue paint on the topsides.  I have also gone back and spot filled a few pin holes below the waterline.

June 21, 08 - Since my last update I have more or less finished building thickness on the topsides paint.  I have also almost finished building the cabin house and cockpit.  This boat has a rather complex cabin house.  In particular, I have had to make provisions for laying the teak decking which is flush with the fiberglass rather than on top of it as is more common.  I should finish building the cabin house within the next couple of days.  The cabin top, the winch plinths and a couple of hatch bases remain to be built.  When that is done I will paint the house and cockpit and then start laying the teak decking.

July 13, 08 - Major construction on this model is now finished including the teak decking.

Aug. 4, 08 - I have now finished painting the model and am varnishing the toe rail.  In addition I have made up the cherry mounting board and am about 40% of the way through varnishing it.  When I finish varnishing the mounting board I will mount the model and start detailing.

Aug. 11, 08 - I have now built the mast and boom.  Over the next few days I will build the vang and add details to the mast.

Aug. 19, 08 - Since my last update I have built the vang, main sheet tackle and traveller.  I also built the rest of the deck hatches.

Sept. 2, 08 - The model is now almost finished.  You can see the folded Gori three blade prop, the pedestal and wheel, the winches and other details on the mast.  I have also added the cleats on the toe rail.

Find out how to order a model

Return to Model Gallery

Return Main Page